Operating Sessions,  Trackwork

Golden Spike!

I finally drove the golden spike on the BC&W layout.

I finally drove the golden spike during the last days of August 2026. With the golden spike driven, trains can finally start running.

Golden spike

Here is the area where the Anderson Grain Company and Prairie Valley Grain elevators are located. It hasn’t received any track yet.

Laying caulk to glue tracks

Spreading caulk

Laying Peco Streamline code 70 flex track

I fill in missing ties when I connect sections of flex track. I use ties that I removed from the ends of the flex track itself.

First, I use a cutter to remove the spikes.

Golden spike! Removing spikes from the ties

Then, I add a drop of matte medium and slide the ties under the rails.

Adding Matte Medium to glue missing ties in place.

Sliding the ties under the rails

On these ties, I cut a notch for the track feeders so I can space the ties properly.

Golden spike. Cutting notch in the ties to accomodate track feeders.

Golden spike! Filling in missing ties where track feeders are.

Using WAGO connectors makes wiring the track feeders much easier.

WAGO connectors

These are the last two spurs serving the Prairie Valley Grain Elevator.

Spurs at Prairie Valley Grain elevator

This officially marks the golden spike ceremony.

Golden spike ceremony

To celebrate, I had my 8-year-old son be the engineer for an improvised operating session.

I taught him to go slowly and couple the cars gently. We set out a few cars around the layout and had fun for 15 minutes. It proved that the trackwork and electrical connections were all good!

M 8-year old son as engineer.

Improvised operating session

Golden spike

Shoving cars toward Prairie Valley Grain elevator

Uncoupling cars

And with that, all the track on the layout is finally in place.

There is still a lot of work ahead, of course. I need to finish wiring some areas, paint and weather the track, add ballast, and eventually build all the scenery and structures around it. Still, reaching this point feels like a major milestone.

After months of planning, cutting, soldering, and laying track, it was really nice to simply run a train and enjoy the layout for a while.

Having my son drive the first train made the little golden spike ceremony even more special.